
Saint-Nazaire is a 480MW offshore wind farm located off France’s Atlantic Coast and owned by EDF Renewables and Enbridge. Tekmar Energy’s TekTube CPS will be deployed to protect the wind farms subsea export cables, whilst 160 TekLink systems will protect the array cables. The CPS will be delivered in 2021.