Nordex has received an order for a 39.9 MW wind farm in Baden-Württemberg, Germany, from a subsidiary of Altus Renewables. The order includes the installation of eight turbines from Nordex’s Delta4000 series at the Seewald wind farm, located in the northern Black Forest.
In addition to turbine installation, the order includes a 20-year service agreement for the turbines. The installation is scheduled to begin in spring 2026 and will consist of seven N149/5.X turbines and one N133/4800 turbine, all with a hub height of 164 metres.